Equipment Validations

Qualification Studies

  • Risk Assesment of the Equipment
  • Preparation of IQ-OQ and PQ Protocoles
  • Carrying out IQ and OQ Tests
  • Preparation of IQ-OQ and PQ Reports
  • Some of the equipments include;
    • Filling Machines 
    • Storage Tanks
    • Sieves
    • Dryers
    • Blistering Equipments 
    • Coating Machines
    • Mills
    • Packing, Labeling, Packaging Machines, 
    • Bottle Filling Machines
    • Fluid Bed Dryers
    • Capsule Filling  Machines
    • Tablet Press Machines